River Gate South Bridge construction

Construction crew work to get the bridge connected to the two cranes to be lifted into place.The bridge makes its way across the yellow riverThe bridge was suspended between two cranes and slowly lifted into place.A crane operator keeps a watchful eye on the bridge.Peering through the bridge crew on each corner helped to line up the bridge with the bolts that will hold it in place.One of the crew that was on each corner of the bridge to make sure it was placed in the right position. A supervisor directs the crane operator as the bridge is gently set in place.Plymouth Mayor Senter strolls across the bridge once it was secured.The bridge spans the yellow river connecting River Gate South development with River Park Square.